When correct results are wrong

Riding an information wave, the question arises as to what is actually valid. Since the beginning, IT has struggled with the difficulty of pulling together data from multiple sources into one report to compute the data found and generate the final report from the results. As long as there is only one report, discrepancies are not apparent. Creating reports from independently running IT systems on the same issues brings unpredictable inconsistencies to light. The leading causes are the differently understood and independently recorded data sources and paths.

Reliable data increases the quality of a report.

  • One storage location
    Redundantly stored data inevitably leads due to erroneous input to inconsistencies, uncoordinated meanings, and different target dates. Global networking allows relevant report data to be stored in one place at a specified time. Plausibility checks minimize inaccurate entries. Eventually, costs are reduced with one storage location and, additionally, through avoiding errors and rework.
  • Standardized data format
    Different formats need to be cleansed (data cleansing) before they can be computed. Text fields need to be made computable, non-uniform units converted (orders of magnitude, such as thousands or millions; units of measure, such as meters and yards; currencies, such as Dollars and Euros), and an agreed number of decimal places supplied. Just deadlines in setting exchange rates blur values in reports. Predefined tables for conversion reduce inconsistencies.
  • Coordinated meaning
    You cannot see in a number what it is supposed to express. Different perspectives lead to distorted figures and statements. Let’s take the number of employees as an example. Are only permanent employees counted? As full-time equivalents or headcounts? Do temporary and part-time employees also count? Do interns count? Do external freelancers, consultants, and personnel leased count? The purpose determines the counting method. Does an area want to be more productive, or should the headcount be high? Before generating internal reports, the meaning of the term employee should be aligned. Otherwise, wrong conclusions will be drawn.
  • Synchronized reporting dates
    Reporting figures follow a local logic, serve the local management for control, and are determined by the conditions on the spot. It means that the creation by the local IT systems and the associated processes lead to an on-site up-to-datedness of the data. If it is retrieved on a centrally determined deadline, it may not match due to different periods. For example, if the local monthly values vary on the last business day due to various time zones – Wellington, New Zealand versus San Francisco, USA.
  • Prepared cross-checks
    Additional info can lead to different results. A hint provides the totals of the overall or unit results, which differ due to the mentioned difficulties or due to the varying views that do not match. If the expected numbers turn out too high, numbers may have been counted twice. If they turn out too low, numbers may have been misinterpreted or are simply lacking. Cross-checks are always needed! If we only have one report, the errors go unnoticed.
  • Continuous adjustment
    As errors only become apparent over time, data quality should be continuously observed. As soon as discrepancies occur, they should be understood and corrected, starting with the following report. In this way, you will eventually get a reliable reporting system.

Bottom line: If multiple data sources are available, input errors, fuzzy checkpoints, and different interpretations of data lead to hardly understood mistakes. If there are repeated mismatches, the readers no longer trust the report and the reporting party. Reliability is enhanced by ONE data source, a reconciled and processable data structure, unambiguous meaning, a synchronized target date, prepared cross-checks, and ongoing adjustment when errors are identified. The well-thought-out calculation path provides a correct result that is wrong if the data quality is poor.

The right moment

Looking at issues is a form of reflection. We become aware of triggers, flows, dependencies and effects. While a measure is being carried out, we attentively take care of the current step. That way, we lack at that moment the required distance from what we are doing. It obstructs our look at connections and indirect or long-term effects. In addition, a lot of time is wasted in discussing needless issues. It takes place beforehand, rarely during, and rather, in retrospect, to find the person responsible for the failure. The best time to learn something is at the end of a section. It does not matter whether it is an era, paradigm, initiative, step, or work package.

The amplitude and duration of a passage are not as uniform as ideally depicted above. Each wave follows its amplitude and takes different durations at each round. As a result, at least one activity ends at any time. These milestones are either the end of an undertaking or the transition to a subsequent step. At this point, all activities are completed. All that is missing are the medium and long-term effects that evolve on their own. There is no better moment to look at a completed action. Whether we believe that the past repeats or not does not make a difference. In retrospect, we have sufficient distance to see the connections. In any case, aspects become visible that are valid for longer terms. The duration of a project and steps can quickly be months or years for social and economic initiatives. An agile project performs a sprint in four weeks, and a military strike force happens within one night. At the end of all activities, it makes sense to look back at what happened and what resulted. The experience can still be easily recalled in the memory. Participants remember the execution shortly after that, what was to be done, how it took place, and what to learn. They could draw insights from the activities and results at the end of every workday to improve the next day. However, regular short-term deadlines put a strain on work time. Therefore, we should set sufficient milestones, but no more.

These After Action Reviews give us the following advantages:

  • Fail early
    The earlier we see that we are off the beaten track, the sooner we leave the dead end. This saves time and money. It avoids efforts on something that will never be used. Not to mention the unnecessarily coordinated links to parallel activities that also become obsolete.
  • Learn early
    As individuals, we are constantly learning subconsciously. We ameliorate what we do as soon as a hurdle appears and find a solution that avoids the problem. When it happens again, we adopt the work-around we found into our routine.
  • Adapt early
    Since lean management, everyone is looking to Japan. The employees can stop the production line whenever they find an error. In no time, the source of the error is identified and corrected. This prevents failures from multiplying and, as a result, rework costs from exploding.

Bottom line: Milestones do not arise by themselves. They are established. Every effort needs its milestones with a specific frequency. Ideally, the activities have made sufficient progress when, with the retrospective, unnecessary mistakes can be avoided in the future. At the same time, all participants are brought up to date. The conclusion of a step is the right moment for this. Participants are still available, and the memoirs are more vivid than sometime later