When correct results are wrong

Riding an information wave, the question arises as to what is actually valid. Since the beginning, IT has struggled with the difficulty of pulling together data from multiple sources into one report to compute the data found and generate the final report from the results. As long as there is only one report, discrepancies are not apparent. Creating reports from independently running IT systems on the same issues brings unpredictable inconsistencies to light. The leading causes are the differently understood and independently recorded data sources and paths.

Reliable data increases the quality of a report.

  • One storage location
    Redundantly stored data inevitably leads due to erroneous input to inconsistencies, uncoordinated meanings, and different target dates. Global networking allows relevant report data to be stored in one place at a specified time. Plausibility checks minimize inaccurate entries. Eventually, costs are reduced with one storage location and, additionally, through avoiding errors and rework.
  • Standardized data format
    Different formats need to be cleansed (data cleansing) before they can be computed. Text fields need to be made computable, non-uniform units converted (orders of magnitude, such as thousands or millions; units of measure, such as meters and yards; currencies, such as Dollars and Euros), and an agreed number of decimal places supplied. Just deadlines in setting exchange rates blur values in reports. Predefined tables for conversion reduce inconsistencies.
  • Coordinated meaning
    You cannot see in a number what it is supposed to express. Different perspectives lead to distorted figures and statements. Let’s take the number of employees as an example. Are only permanent employees counted? As full-time equivalents or headcounts? Do temporary and part-time employees also count? Do interns count? Do external freelancers, consultants, and personnel leased count? The purpose determines the counting method. Does an area want to be more productive, or should the headcount be high? Before generating internal reports, the meaning of the term employee should be aligned. Otherwise, wrong conclusions will be drawn.
  • Synchronized reporting dates
    Reporting figures follow a local logic, serve the local management for control, and are determined by the conditions on the spot. It means that the creation by the local IT systems and the associated processes lead to an on-site up-to-datedness of the data. If it is retrieved on a centrally determined deadline, it may not match due to different periods. For example, if the local monthly values vary on the last business day due to various time zones – Wellington, New Zealand versus San Francisco, USA.
  • Prepared cross-checks
    Additional info can lead to different results. A hint provides the totals of the overall or unit results, which differ due to the mentioned difficulties or due to the varying views that do not match. If the expected numbers turn out too high, numbers may have been counted twice. If they turn out too low, numbers may have been misinterpreted or are simply lacking. Cross-checks are always needed! If we only have one report, the errors go unnoticed.
  • Continuous adjustment
    As errors only become apparent over time, data quality should be continuously observed. As soon as discrepancies occur, they should be understood and corrected, starting with the following report. In this way, you will eventually get a reliable reporting system.

Bottom line: If multiple data sources are available, input errors, fuzzy checkpoints, and different interpretations of data lead to hardly understood mistakes. If there are repeated mismatches, the readers no longer trust the report and the reporting party. Reliability is enhanced by ONE data source, a reconciled and processable data structure, unambiguous meaning, a synchronized target date, prepared cross-checks, and ongoing adjustment when errors are identified. The well-thought-out calculation path provides a correct result that is wrong if the data quality is poor.

The concept is feasible, if it functions comprehensibly

In art and entertainment, you can find formats that are based on improvisation. Action Painting, Jazz, Improvisational theater or talk shows offer a simple framework where the participants create results that are not previously planned in detail. In the construction of buildings, the programming of IT-applications or the foundation of an enterprise, a more extensive preparation is indispensable. The various parts are developed in relationship to one another. They are supposed to fit eventually as planned. One of the leadership tasks is it to ensure a consistent concept, besides the self-management, the coordination, the communication and cooperation. At best, one starts with a short description that shows that the intention is logically feasible.

Konzeption

In this first sketch, the following four aspects should be described in a way that one can decide, whether the effort of a detailed concept is worth it.

  • Goals
    This is to describe the desired target state as goals – the main goal and the corresponding sub goals. They should be formulated in a way that also outsiders understand the project.
  • Premises
    Thepremises describe the conditions that have to be fulfilled, in order to realize the project. This includes the required number of employees, the needed financial means, the necessary infrastructure (i.e the hard and software, spaces and media of all kinds) as well as the crucial skills and knowledge.
  • Results
    Theresults are always products and/or services. Products are split into expendable or durable goods. Services are person- or object-related. At this point, the understandable, complete list is better than results that are described in detail. In later preparation, the individual results are specified in more detail.
  • Explanation
    Theexplanations should further clarify the project to the reader. The vision and the mission obtain thereby the purpose of the plan. The listing of the substantial functions and processes convey the way, how the individual elements work with each other. The history and additional interesting information complete the picture. The explanations should be limited to those aspects that clarify the project and be formulated short and simple.

The biggest challenges in describing the concept are the determination of the length and the level of detail that should be prepared at this point of time, at the beginning of the process. Since the size of a project differs very much, there is no clear answer about the number of pages or other key figures. As rule of thumb, consider the following:

  • Outline as extensive, as necessary for understanding.
  • Describe as detailed, as necessary for the current decision.
  • Invest as little time, as possible.
  • Illustrate always goals, premises, results and explanations, as clearly as possible.

Eventually, you should be able to say: The concept is feasible, if it functions comprehensibly.